First Van der Valk hotel in Amsterdam - Vroom Funderingstechnieken
Default sam 5108 ph

First Van der Valk hotel in Amsterdam

For the construction of the first Van der Valk hotel in Amsterdam, Vroom Foundation Technology is applying vibro combo piles. Designed by OeverZaaijer, the building will house 206 rooms, conference and wellness facilities and 135 parking lots.

We realize the capacity by applying almost 270 vibro combo piles. These are vibro piles with a prefab element in the cores. The prefab elements will be used to attach the floor of the parking basement to. The piles measure 26 m with a 559 mm diameter.

The hotel

The hotel will be built alongside the A2 and is accessible via the adjacent subway station and its own quay on Duivendrechtsevaart. On the third floor, a bar with wellness and fitness facilities plus a swimming pool will be built. This is also the point where the hotel rooms can be found until the upper layer of the high building.

Default rsm 78 104
Can we help you with your project?