Shopping center Kanaleneiland - Vroom Funderingstechnieken
Img 07

Shopping center Kanaleneiland

Running errands and seeing at the same time how Vroom in the middle of shopping center drills foundation piles into the ground using the low-vibration and low-sound technique. Utrecht residents stared their eyes out.

Facts & Numbers

Project 68060
Location shopping center Kanaleneiland, Utrecht.Client P. van 't Wout Funderingstechnieken

Foundation activities/pile system

Drilled steel tubular piles with grout injection
Number of piles 22
Length 12,5 m
Diameter 219 mm
Segment length around 4 m