Revision Hitachi powerhouse - Vroom Funderingstechnieken
Img 07
November 13, 2014

Revision Hitachi powerhouse

In Beilen in Drenthe, Cape Holland Group has got to work with the Hitachi CX700GLS foundation rig. Parts have been revised or replaced and the rig was painted red again.
Default kraan 890

At the moment, the rig has been deployed in order to realize DPA piles in Lisse for an assisted living facility, but it is qualified to produce all cast-in-situ pile systems until a depth of around 35 m. Also prefab CFA piles until 32 m are made by this powerhouse.

Personality

With the revision of this rig, the activities will not be paused as in the near future, more will follow so that the machinery is made ready for the future and will have the personality that we desire.